Shared Use Path on Seaview Road

The City of Charles Sturt contracted Remo Contractors Pty Ltd to complete the concrete pour for the Seaview Road Shared Use Path, from the 8th of September 2019 until the 14th of January 2020.

The concrete pour included two layers of SL72 galvanised mesh floating dowels every 5 meters and Connolly joints every 20 meters. The concrete that was poured was in the colour 40MPA Nullarbor.

During this time Remo Contractors Pty Ltd was also contracted to lay the Charcoal Adbri Unipave paving band, the chair areas and the footpaths that lead into the shared concrete path.

The completed works for this job were valued at approximately $200,000.00.