March 2020

Floodway Installation: Light Regional Council – St Kitts Road, St Kitts

By |2020-03-11T10:54:23+09:30March 11th, 2020|

Floodway Installation on St Kitts Road The Floodway Installation on St Kitts Road started on the 18th of November 2019 and was completed by the 29th of November 2019. The Light Regional Council contracted Remo Contractors Pty Ltd to remove the old concrete slab and excavate and install new 8.4m x 900mm x 450mm reinforced

February 2020

Shared Use Path: City of Charles Sturt – Seaview Road, West Beach

By |2020-02-18T14:33:34+09:30February 18th, 2020|

Shared Use Path on Seaview Road The City of Charles Sturt contracted Remo Contractors Pty Ltd to complete the concrete pour for the Seaview Road Shared Use Path, from the 8th of September 2019 until the 14th of January 2020. The concrete pour included two layers of SL72 galvanised mesh floating dowels every 5 meters

November 2019

New Kerb and Gutter: City of Tea Tree Gully – Golf Drive, Fairview Park

By |2019-11-26T09:47:56+09:30November 26th, 2019|

New kerb and gutter on Golf Drive The City of Tea Tree Gully contracted Remo Contractors to upgrade Golf Drive, Fairview Park by constructing new kerb and gutter, concreting footpaths and adding stone set permeable paving. Works for this contract included machine laying 250m of kerb and gutters, 514m2 of new concrete footpath and also

August 2019

Remo Contractors Traffic Control (RCTC)

By |2019-08-23T13:41:44+09:30August 23rd, 2019|

Introducing Remo Contractors Traffic Control (RCTC) RCTC conduct all required works for your traffic control demands while adhering to the current Australian Standards and regulations. RCTC is available upon phone call or email 24 hours a day / 7 days a week with our highly experienced traffic controllers having over 10 years of work conducted

Road Reconstruction: City of Charles Sturt – Burleigh Avenue, Pennington

By |2019-08-23T12:22:26+09:30August 23rd, 2019|

Road Reconstruction of Burleigh Avenue The reconstruction of Burleigh Avenue started in October 2018 and was completed by January 2019. The City of Charles Sturt contracted us to narrow the existing road from 12m to 7.5m with a new kerb alignment to allow for the construction of a Shared Use Path on the northern side.